Basrah Rumaila Waste Centre Project

عميل:

British Petroleum

موقع:

South Rumaila

مساحة:

100,000 m3

تم الانتهاء من:

2017

Having already completed the main shed for the Rumaila Waste Centre (RWC) incinerators, we also have completed all the surrounding infrastructure for the incinerator civil works. The works included: Demercation Leveling, Generators and transportation, shed erection and installation, Security, Dyna tower transportation and installation, Gantry Fabrication, transportation and erection, Main shed fabrication, transportation, erection and installation. The project was completed ahead of schedule and in record time.